Test a supplier’s price-increase letter against the escalation clause and the index it cites, level three quotes onto one scope sheet, and build the should-cost, from the quotes, exports and contracts already in your folder.

Ultramarine WorkComing to Windows
QBR-Meridian-Components.pptxExample

Supplier review, Q1–Q3

Meridian missed the 95% OTIF target in Q2 and Q3, mostly on late castings

  • OTIF was 88.4% year to date across 1,210 order lines
  • Q1 reached 95.6%, Q2 fell to 81.3% and Q3 recovered only to 88.3%
  • Quality held at 410 PPM against the 500 PPM target

Misses by cause

Late castings from Meridian’s foundry caused 78 of the 140 missed lines

  • Late castings78 lines
  • Short shipments31 lines
  • Wrong revision18 lines
  • Missing certs13 lines

Asks of Meridian

Ask Meridian for a second casting source and a 30-day recovery plan

  • Weekly OTIF reports until three straight weeks at 95% or better
  • Credit for $46,800 of expedited freight under section 7.3 of the agreement

Ask it for

  • “Read Northline Steel’s 8% price increase letter and test it against the steel-index escalation clause (4.2), then draft our counter showing the arithmetic.”

    Price-increase-response-Northline.docx
  • “Level the three quotes for the racking package against the scope sheet, plug the freight and installation exclusions, and rank the bids.”

    Bid-tab-racking-package.xlsx
  • “Build a should-cost for bracket 4471 from the BOM and routing hours: 6061 material with 8% scrap, cycle times at the machine rate, and a 9% margin.”

    Should-cost-bracket-4471.xlsx
  • “Cascade Paper shows up under three names in the Q3 AP and PO exports, so merge them into one supplier. Cube the data and flag off-contract items above $10,000.”

    Spend-cube-Q3-2026.xlsx
  • “Redline the supplier’s master services agreement draft against our standard positions and list every liability and payment change for legal.”

    MSA-redline-issues.pdf
  • “Turn this year’s OTIF and quality data into a supplier review deck for Meridian Components, with every miss and its cause on the slides.”

    QBR-Meridian-Components.pptx

How it works

  1. 1

    Open the sourcing folder

    Supplier quotes and their cover letters, price increase letters, the signed agreement with every amendment, AP and PO exports, BOMs and routings, certificates of insurance and index clippings, as you already keep them.

  2. 2

    Ask for the work

    A leveled tab with every exclusion priced, an index test against the escalation clause, a should-cost marked known, estimated or assumed, and every number cited to the file it came from.

  3. 3

    Check it and make the award

    Rerun anything odd in Excel and check the index movements against the published series before you put what you accept into the PO. The tab, the abstract and the award stay with you, and nothing is sent or posted.

Inside the Procurement & Sourcing mode

  • Purchase orders and price variance

    Run the supplier’s increase through the escalation clause it invokes and the index movement behind it, then split the month’s purchase price variance by driver.

  • Bid tabulation and leveling

    Set the scope baseline, mark what each bidder included, excluded, qualified or left silent, price every gap with your plug values, and rank the leveled totals.

  • Should-cost model

    Cost the part from buy weight, scrap, cycle time and machine rate, with profit on its own line, so the gap to the quote is the negotiation agenda.

  • Spend cube analysis

    Cut the spend by category, supplier and month, and merge the name variants of the same vendor. State savings as reduction or avoidance against the baseline.

  • Contract abstraction and obligations

    Abstract the signed agreement and every amendment in order of precedence, and compute each renewal notice deadline from the wording, clause by clause.

  • Certificate of insurance tracking

    Check each certificate’s endorsements against the contract’s insurance section, from additional insured forms to primary and noncontributory wording.

  • Statement of work

    Write the SOW or performance work statement with deliverables, acceptance criteria, exclusions, change control and the QASP the inspection team grades against.

  • Contract drafting and redlining

    Mark up the supplier’s draft against your standard positions and hand legal an issues list that names the section behind each flag.

  • Landed cost and tariff exposure

    Apply the duty in force on the entry date to each SKU, then add MPF, HMF, freight and brokerage, and show what moving origin would change.

  • Determinations and justifications

    Draft the sole source justification or D&F with the required elements in order and the market research presented as it was.

  • Business case and capital allocation

    Model the build-versus-buy case with cash flows, NPV and IRR, and keep every assumption visible on the sheet the CFO reviews.

  • Supply chain KPI scorecard

    Compute OTIF, fill rate and defect PPM to the definitions agreed with the supplier, line by line, and show what was excluded from the count.

Office skills
Excel, Word, PowerPoint, PDF
Tools
Read, edit and write files, Search files, Run code, Search and read the web, View images
Connectors
SharePoint, Google Drive, Gmail, and additional custom connectors
House style
Your fonts, layouts and rules, on every file

Who it’s for

Everyone in a commercial purchasing or procurement team, from procurement clerks and buyers to category managers, supplier contract administrators and chief procurement officers.

Questions

Can I put supplier quotes, price lists and signed contracts into it?

Yes, and quotes and bids are often under NDA, so confirm with your compliance team before you load them. Ultramarine Work changes files only in the project’s folder. When a request needs it, it can read files elsewhere on your computer, never passwords, keys or app data, and you can turn that off in settings. The model runs on Paper Instruments’ servers, so the content it works on is sent there to be processed. Paper Instruments is SOC 2 Type II, and our security and compliance details are on our compliance page.

Can it score the bids and pick the winning supplier?

No, the scoring, weighting and award stay with the buyer or the evaluation panel. It builds the tab, prices the exclusions and shows the gaps, and it lists which clarifications still need a written answer from bidders before any total is final. Silence on scope is not a price.

How do I stop it inventing prices, index figures or clause numbers?

Its skills tell it to cite a source file for every number and statement it uses, and to note anything it could not find or reconcile instead of guessing. Verify every market figure against the published data before it crosses the table, and review every file it touched. That review is what makes the numbers defensible when a supplier contests them.

Can it redline liability and indemnity clauses?

No, liability and indemnity wording belongs to your lawyers. It can draft the first-pass commercial markup for price, payment terms, service levels and termination wording, and it flags the clauses that carry legal risk. Its redlines are proposals for review, never the wording that goes to the supplier.

What happens if we miss a notice deadline in a contract it abstracts?

The contract renews for another full term, because that is how auto-renewal clauses are written. Ultramarine Work computes the deadline from the contract’s wording, amendments included. The register still needs a named owner who decides on the renewal and gives notice before the window closes.

Try the Procurement & Sourcing mode in Ultramarine Work