AI for construction project managers

It prices change orders under the contract’s changes clause, builds the G702 and G703 with retainage, levels sub bids and checks the schedule update, all from the files already in your job folder.

Ultramarine WorkComing to Windows
Pay-app-14-G703.xlsxExample
ItemScheduled valueCompleted to date% (G÷C)Retainage 10%Waiver, pay app 13
03 3000 Concrete1,486,0001,486,000100.0%148,600Received
04 2200 Masonry612,400459,30075.0%45,930Received
09 2900 Gypsum board1,138,000512,10045.0%51,210Missing
23 0000 HVAC2,940,0001,617,00055.0%161,700Received
26 0000 Electrical2,215,0001,107,50050.0%110,750Received

NoteSummit Interiors has not sent its unconditional waiver for pay app 13, which the owner requires before it releases this draw.

Ask it for

  • “Build pay application 14 for the Cushing Medical Pavilion from the schedule of values, carry 10% retainage, and name the subs missing unconditional waivers.”

    Pay-app-14-G703.xlsx
  • “Price change order 042 for the added CMU wall on level 2 from the sub quotes and field hours. Apply the allowed markups and check the notice date.”

    CO-042-pricing.xlsx
  • “Level the three drywall bids against the scope sheet, plug the firestopping and hoisting exclusions with our estimate, and show raw totals beside leveled ones.”

    Drywall-bid-tab.xlsx
  • “Set up the submittal register for spec sections 08 44 13 and 07 42 13 in the manual, and give every item a need-by date and the paragraph it came from.”

    Submittal-register.xlsx
  • “Draft a job hazard analysis for the trench and shoring work in the north parking lot that applies the hierarchy of controls, with a foreman sign-off block.”

    JHA-trench-shoring.docx
  • “Redline the Kestrel Mechanical subcontract. Mark every pay-if-paid, no-damage-for-delay and broad-form indemnity clause, and draft a counterproposal for each.”

    Subcontract-redline.pdf

Inside the Construction Project Management mode

  • Change order pricing

    A change event goes in and a priced CO comes out, built up from sub quotes and field hours at the markups the contract allows, with the notice deadline checked.

  • AIA pay applications and retainage

    Fills the continuation sheet line by line from the schedule of values, carries the retainage both ways, and names the subs whose lien waivers are missing.

  • Project budget and cost forecast

    The monthly cost report comes together by cost code, with commitments, actuals, cost to complete, EAC and fee burn, and every variance has a source behind it.

  • Construction administration

    Each row of the submittal register cites the spec book paragraph that required the item, and the RFI log stays current on ball in court.

  • Project schedule

    Writes a logic-linked schedule with a WBS the super can run crews from, baselines it, and statuses each update without breaking the logic.

  • Schedule health and delay analysis

    Runs the 14-point style tests on each update, then builds the fragnet and measures the slip when a time extension request calls for it.

  • Bid tabulation and leveling

    Levels subcontractor bids against the scope sheet, plugs the exclusions with estimated values, and prices alternates and unit prices at the expected quantities.

  • Certificate of insurance tracking

    Before mobilization, it checks each COI against the subcontract’s insurance article and flags missing endorsements, short limits and expirations.

  • Safety programs and hazard analysis

    Drafts the site-specific safety plan and job hazard analyses, with the controls ordered from elimination down through engineering and PPE.

  • Safety incidents and OSHA records

    Takes a field injury through the report and the 300 and 301 entries, computes TRIR and DART, and leaves the recordability call to your safety team.

  • Contract drafting and redlining

    Redlines subcontracts and writes the issues list, with a position on every flow-down, indemnity, pay-if-paid and no-damage-for-delay clause.

Office skills
Excel, Word, PowerPoint, PDF
Tools
Read, edit and write files, Search files, Run code, Search and read the web, View images
Connectors
SharePoint, Google Drive, Gmail, and additional custom connectors
House style
Your fonts, layouts and rules, on every file

How it works

  1. 1

    Put the job folder together

    That means the owner contract and spec book, the schedule of values, subcontract bids and drafts, P6 or Excel schedule exports, submittal packages, daily logs and the subs’ COIs, filed the way document control already keeps them.

  2. 2

    Ask for the piece in front of you

    What comes back is the G703 with retainage computed on every line, the change order priced under the changes clause with the allowed markups, or the bid tab with the exclusions plugged. Every number traces back to the file it came from.

  3. 3

    Review it line by line

    Follow each line to the quote, invoice or daily log that supports it, confirm notice dates, and make the calls on substitutions and recordability. The pay application and CO responses go out only after your review.

Who it’s for

Construction project managers and engineers, superintendents and foremen, document control coordinators, project executives and owner's representatives.

Questions

Will it invent ASTM designations and spec requirements that don’t exist?

No, it is not supposed to invent anything. When it cannot trace something, it says so instead of guessing, and it cites the source file for every number and statement it uses. A spec reference points to the paragraph or drawing it came from, so you check the reference against the manual. You review every file it touched before anything goes to the architect.

Can it price a change order without knowing our subs’ negotiated rates?

Yes, it builds the price from the documents in the folder, including the subcontract quotes, field hours, equipment logs and the contract’s unit prices and markup terms. Where a rate is missing, it flags the gap instead of filling it, so the negotiation over that rate stays between you and the sub.

Where does our project data go?

Ultramarine Work changes files only in the project’s folder. When a request needs it, it can read files elsewhere on your computer, never passwords, keys or app data, and you can turn that off in settings. The model runs on Paper Instruments’ servers, so the content it works on is sent there to be processed. Paper Instruments is SOC 2 Type II, and our security and compliance details are on our compliance page.

Try the Construction Project Management mode in Ultramarine Work

Ultramarine WorkComing to Windows